This is a sealed‑bid, “all‑or‑none” procurement for the design, installation, and one‑year maintenance of median landscaping along Grelot Road (Cody Road → Hillcrest → Knollwood → University Boulevard) in Mobile, Alabama. The scope includes soil testing, amendment, mulching, fertilization, erosion‑control fencing, tree pruning/removal, stump grinding, traffic‑control coordination, and post‑installation cleanup, all performed to ANSI A300 and ANSI Z133 standards. Bids are submitted by 11 a.m. on July 23 2021, must include a 5 % bid bond, and the contractor must begin work within 30 days of award and complete initial planting within 45 days, followed by a 12‑month maintenance warranty. The contract is split into three separate median sections that may be awarded individually, and any contract exceeding $50 k must include at least 15 % participation by socially/economically disadvantaged individuals.
• Project location: Grelot Road medians between Cody Road and University Boulevard, Mobile, AL.
• Required qualifications: ISA‑certified arborist, compliance with ANSI A300/Z133, ability to provide a bid bond, general liability/auto/workers’ comp insurance, and E‑Verify enrollment.
• Mandatory pre‑bid conference: July 20 2021, 8:30 a.m., south side of Grelot Road.