The Missouri Greenway (Great Rivers Greenway District) is soliciting bids to replace way‑finding and interpretive signage along the Monarch‑Chesterfield Levee Trail. Work includes demolition of existing signs, fabrication and installation of new signs (various models with and without posts), construction of ADA‑compliant concrete pads, and application of environmental graphics on flood‑wall concrete surfaces. The contractor must obtain all required permits (USACE, city, and state), provide a 5 % bid bond (if bid > $50,000), and furnish a 100 % performance & payment bond upon award. The scope also covers site‑work such as traffic control, concrete saw‑cutting, and site restoration.
• Demolition of ~10‑20 existing signs and removal of associated footings.
• Fabrication/installation of a full inventory of custom wayfinding signs (In, Ix, Gx, Kx, Rx series) plus environmental graphic murals (~1,738 sf).
• Concrete pad construction, traffic‑control devices, erosion control, and site restoration, all compliant with USACE and local regulations.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.