The City of Temple is seeking a contract for the demolition of the existing 250,000 gallon elevated storage tank and the construction of a new 1,000,000 gallon elevated storage tank. The contract includes the construction of a new water line to be bored under FM 2305. The bid tabulation document lists the prices for various items, including mobilization, bonds, and insurance, as well as the construction of the tank and water line. The contract was awarded to Landmark Structures I, LP, with a total base bid amount of $2,688,000.00.
• The contract includes the demolition of the existing tank and the construction of a new tank.
• The contract includes the construction of a new water line to be bored under FM 2305.
• The bid tabulation document lists the prices for various items, including mobilization, bonds, and insurance.
• The contract was awarded to Landmark Structures I, LP.
• The total base bid amount is $2,688,000.00.