The State of Utah, Division of Facilities Construction and Management (DFCM), is requesting bids for the construction of the TSOB Annex Building Pressure Upgrades project. The project includes modifications to the existing exhaust, relief, and controls system, as well as replacing the generator exhaust dampers and the duck pond pump. The construction cost estimate is $110,000.00. The bid documents are available on the Utah Public Procurement Place (U3P) website. A mandatory pre-bid meeting and site visit were held on September 25, 2024. The vendors which this contract was awarded to are Commercial Mechanical Systems & Services Inc., U.S. Mechanical L.L.C., and Kemp and Hilton Inc.
• The project includes modifications to the existing exhaust, relief, and controls system.
• The project includes replacing the generator exhaust dampers with barometric for immediate response when starting the generator.
• The project includes replacing the duck pond pump.
• The construction cost estimate is $110,000.00.
• The bid documents are available on the Utah Public Procurement Place (U3P) website.
• A mandatory pre-bid meeting and site visit were held on September 25, 2024.