This contract is for the replacement of flooring at Scott Elementary School. The base bid scope includes the installation of new Epoxy Resin Flooring in the locations shown on the floor plan and in the schedules below, with approximately 925 sq. ft of ERF required in the noted restrooms. The add alternate No. 1 scope includes the installation of new toilet partitions in the Scott Elementary School Boy’s Restrooms, but not the 3 individual toilet rooms for teachers and staff. The contract was awarded to Advanced Coatings, Inc. for a total of $26,225.00.
• The contract includes the installation of new Epoxy Resin Flooring and toilet partitions
• The project must be completed within 30 days
• The contract was awarded to Advanced Coatings, Inc. for a total of $26,225.00
• The point of contact for this bid is Deana Merryman, with an email address and phone number listed