This contract is a public‑works project to replace playground equipment at two county parks—Martha Lake Airport Park and Paine Field Park—in Snohomish County, Washington. The scope includes demolition of existing structures, temporary erosion and sediment control, site grading and drainage, installation of new playground equipment and synthetic turf surfacing, fencing, water‑fountain and bench amenities, paving, and final site clean‑up with as‑built drawings. The award was made to Diverse Earthworks, Inc. on a firm‑fixed‑price basis, with a total contract value of approximately $725,000 (including Washington sales tax). The procurement was conducted through a full and open competition, with bids received by August 18 2026 and the contract awarded on September 9 2026.
• Scope: full playground replacement (equipment, surfacing, site work) for two park sites.
• Awarded to: Diverse Earthworks, Inc., a qualified civil‑construction firm with relevant playground‑installation certifications.
• Value: $725,222 (incl. 10.5 % WA sales tax).
• Procurement: open competition, no set‑aside, firm‑fixed‑price/lump‑sum contract.