The contract is for the repair of the Chumash Auditorium floor at California Polytechnic State University, San Luis Obispo. The work consists of providing all labor, products, equipment, and services required for the project, in accordance with the plans and specifications. The contract was awarded to Newton Construction & Management Inc. with a base bid amount of $348,000. The project duration is 65 calendar days, and the contractor is required to achieve 3% DVBE participation. Some key points about this contract include:
• The contract is for a minor capital project
• The project requires the contractor to provide all labor, products, equipment, and services
• The contract has a base bid amount of $348,000
• The project duration is 65 calendar days
• The contractor is required to achieve 3% DVBE participation