This contract calls for the complete demolition of a residential‑type structure located at 916 Shady Brook Drive, Mobile, AL, using wet‑demolition methods to control dust and hazardous material release. The contractor must cap and disconnect all sanitary sewer, water, and gas utilities, remove all debris, provide erosion‑control BMPs, and restore the site with topsoil, seeding, and mulching. The award is a stipulated‑sum, single‑source bid awarded to Monster Mulching LLC, with a 30‑day performance window from the Notice to Proceed. Key elements include hazardous‑material handling (lead‑based paint, asbestos), strict storm‑water compliance, extensive documentation (photos, waste‑shipment records, lien releases), and insurance/bonding requirements.
• Wet‑method demolition of all structures, footings, and underground utilities.
• Utility capping, erosion control BMPs, and post‑demolition site stabilization.
• Mandatory submission of detailed close‑out documentation and compliance with federal, state, and local environmental regulations.