This contract obligates the City of Mobile to engage a contractor for a rapid, wet‑method demolition of all structures at 1704 Griffin Street, including removal of foundations, utility caps, and onsite debris, while preserving an existing aluminum fence. The contractor must also perform site clearing, vegetation removal, erosion‑control BMP installation, and proper handling of lead‑based paint and asbestos‑containing materials. All required permits, insurance, E‑Verify verification, and post‑completion documentation (photos, waste‑shipment records, newspaper notice) are mandatory, and a $250 per day liquidated‑damage clause applies for any work extending beyond a 15‑day performance window.
• Wet‑method demolition of all structures and foundations, with utility disconnections and debris removal.
• Comprehensive site preparation, vegetation removal, and BMP‑based erosion‑control, including final seeding and mulching.
• Strict hazardous‑material (lead‑paint, asbestos) handling, disposal, and reporting requirements, plus mandatory close‑out paperwork and a $250/day late‑completion penalty.