The contract is for the replacement of flooring at McClure Elementary School. The scope of work includes the installation of VCT flooring, carpet, and resinous flooring, as well as the removal and installation of existing flooring. The contract also includes several add alternates for additional work, such as moisture mitigation and chemical abatement. The contract was awarded through an Invitation for Bid (IFB) process, and the bid was opened by Jesse Wilson, the Director of Purchasing Services for Topeka Public Schools. Some key points about this contract include:
• The contract is for a lump sum price, with a total bid amount of $243,490.00, $221,000.00, and $349,926.00 from the different bidders.
• The contract includes a base bid and several add alternates for additional work.
• The contract was awarded through an IFB process, and the bid was opened by Jesse Wilson.
• The point of contact for the contract is Jesse Wilson, who can be reached at [email protected] or (785) 295-3066.