This contract calls for the wet demolition of an existing wood‑framed structure located at 1479 Navco Road, Mobile, AL 36605, including removal of footings, slabs, and associated concrete work, as well as utility disconnections, site clearing, and comprehensive erosion‑control measures. The contractor must handle lead‑based paint and asbestos in accordance with hazardous‑material regulations, provide permanent site stabilization, and submit extensive documentation (photos, waste‑shipment records, and AIA close‑out forms). The work must be completed within 15 calendar days after a Notice to Proceed is issued, with liquidated damages of $250 per day for any overruns. The City of Mobile’s Municipal Enforcement Department oversees the procurement, and the award was made to NU VISION CONSTRUCTION INC.
• Wet demolition (all demolition must be performed while wet to suppress dust).
• Mandatory erosion‑control BMPs and final site stabilization (top‑soiling, seeding, mulching).
• Hazardous‑material handling (lead‑based paint, asbestos) and disposal at permitted landfills.
• Tight schedule: 15‑day completion window with $250/day liquidated‑damage provision.