This contract concerns the resurfacing of twelve municipal streets in Worcester, Massachusetts, including full‑depth milling, grind‑overlay, curb and gutter work, utility adjustments, tree removal, seeding, and a $200,000 lump‑sum reserve for contingency. The scope also includes limited water‑hold (service/main) work on a subset of streets and a decorative‑fixture specification for six items. The procurement was conducted as a sealed‑bid, full‑open competition with a 5 % bid bond requirement and performance/payment bonds for the full contract sum. The lowest responsive bidder, PJ ALbert, was awarded the contract at approximately $2.34 million. Key dates include a bid submission deadline of 6 April 2022, a start‑work requirement by 15 Oct 2022, substantial completion by 15 Nov 2022, and final completion by 15 Dec 2022.
• Scope: Asphalt resurfacing, milling, grinding, curb/ gutter, utility adjustments, tree work, seeding, and $200 K contingency.
• Geographic focus: Twelve specific streets in Worcester, MA, with water‑hold work on Breck, Rodney, Harvard Plaza, and Harvard St.
• Procurement method: Sealed‑bid, full competition; award to lowest responsible bidder (PJ ALbert) at ~$2.34 M.