Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kansas
  4. ›Construction
  5. ›Cured In Place Pipe Rehabilitation

Awarded contract·City of Olathe·Kansas

Cured In Place Pipe Rehabilitation

Won by Insituform Technologies USA, LLC$957kSingle Award
Contract source

Awarded vendors

  • Insituform Technologies USA, LLC

Description

The City of Olathe, Kansas, is seeking bids for the Cured In Place Pipe (CIPP) Rehabilitation project. The project involves the installation and application of 25,120 linear feet of trenchless CIPP in gravity sanitary sewer mains of various diameters. The work also includes cleaning and preparations, service lateral reinstatements, traffic control, bypass pumping, and safety equipment required for confined space entry. The bid documents, including drawings and specifications, are available for download on the city's website. The engineer's estimate for the project is $956,669.80. The contract was awarded to the lowest bidder, but the document does not specify which company was awarded the contract. • The project involves the installation and application of CIPP in gravity sanitary sewer mains of various diameters. • The work includes cleaning and preparations, service lateral reinstatements, traffic control, bypass pumping, and safety equipment required for confined space entry. • The bid documents, including drawings and specifications, are available for download on the city's website. • The engineer's estimate for the project is $956,669.80. • The contract was awarded to the lowest bidder, but the document does not specify which company was awarded the contract.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
1-R-006-15

Contract value

$956,670

The contract value can be estimated based on the engineer's estimate, which is $956,669.80. The bids received from the contractors are: Insituform Technologies USA, LLC - $829,471.50, IPR South Central, LLC - $1,007,059.00, and SAK Construction, LLC - $847,946.25. The contract was awarded to the lowest bidder, but the document does not specify which company was awarded the contract. Therefore, the estimated contract value is between $829,471.50 and $1,007,059.00.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Buy Board Purchasing Cooperative·Texas

Top match · 78%

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Thermo Cured Products)

Closes 11/12/2026Opened 9/4/2026

Buy Board Purchasing Cooperative·Texas

75% match

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Ultraviolet-Light Cured Products)

Closes 11/12/2026Opened 9/4/2026

City of Marysville, Ohio·Ohio

71% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

City of West Des Moines·Iowa

70% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

City of Chula Vista·California

70% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

Georgia City of Sandy Springs·Georgia

69% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of Bellevue·Washington

68% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

Greenwood Metropolitan District·South Carolina

68% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

City of Albany·Georgia

67% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

City of Charlotte·North Carolina

67% match

Pipe Patching Services

Rolling / TBD closeOpened 6/29/2026

Town of Honea Path·South Carolina

67% match

Chiquola and Clatworthy Subbasin Sewer Rehab Phase 3 (Division C)

Closes 11/24/2026Opened 10/23/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

66% match

CONSUMABLES PIPE WRAP THREAD SEALANT MATERIAL DROP PIPE REPAIR

Closes 11/9/2026Opened 10/28/2026

West County Wastewater·California

65% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Fresno·California

65% match

Sewer Rehabilitation in Clinton, Fruit, McKinley, and West Avenues

Closes 11/3/2026Opened 9/29/2026

City of Appleton, WI·Wisconsin

65% match

N-26 Sewer spot repairs, protruding tap and mineral deposit removal

Closes 11/2/2026Opened 10/20/2026

City of Shawnee·Kansas

65% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Defense·Missouri

65% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Metropolitan Council·Minnesota

64% match

Coon Rapids 4-NS-525 Rehabilitation

Closes 11/10/2026Opened 9/24/2026

City of Phoenix·Arizona

64% match

SANITARY SEWER REHABILITATION PROGRAM JOB ORDER CONTRACT

Closes 11/30/2026Opened 10/29/2026

City of Redlands·California

64% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Connecticut Town of Fairfield·Connecticut

64% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

School District of Philadelphia (General Opportunities)·Pennsylvania

64% match

On Call Piping Repairs

Closes 1/12/2027Opened 10/30/2026

City of Fargo·North Dakota

64% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

Connecticut UConn Health Center·Connecticut

63% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

City of Waukegan·Illinois

63% match

O'Plaine Road and I-94 Tollway Water Main Rehabilitation

Closes 11/3/2026Opened 10/22/2026