Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›/SACRAMENTO POWER AUTHORITY/CITY OF SACRAMENTO - WATER…

Awarded contract·County of Sacramento·California

/SACRAMENTO POWER AUTHORITY/CITY OF SACRAMENTO - WATER RECYCLYING PIPELINE - PHASE 1B

Won by Vinciguerra Construction +6 more$6.0MMultiple Award
Contract source

Awarded vendors

  • Vinciguerra Construction
  • Teichert Construction
  • Ranger Pipelines, Inc.
  • Mountain Cascade Inc.
  • Steve P Rados Inc.
  • Marques Pipelines
  • Preston Pipelines

Description

The contract is for the construction of a water recycling pipeline, approximately 21,000 feet long, with diameters ranging from 18 inches to 10 inches. The project also includes the installation of approximately 1,500 feet of linear PVC pipe. The contract was awarded to Vinciguerra Construction, with a bid price of $5,984,415.00. The contract is administered by the County of Sacramento, Contract and Purchasing Services Division. • The contract includes the installation of a water recycling pipeline and a PVC pipe. • The project requires the installation of approximately 21,000 feet of pipeline. • The contract was awarded to Vinciguerra Construction. • The bid price for the contract is $5,984,415.00. • The contract is administered by the County of Sacramento, Contract and Purchasing Services Division.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Industry
Construction
NAICS
237110
Solicitation №
4313

Contract value

$5,984,415

The contract value can be estimated based on the bid price of $5,984,415.00 submitted by Vinciguerra Construction. This price likely includes all costs associated with the construction of the water recycling pipeline, including materials, labor, and equipment. However, without more detailed information about the contract terms and conditions, it is difficult to provide a more precise estimate. Factors that may influence the contract value include the complexity of the project, the availability of materials and labor, and any potential changes or modifications to the scope of work.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

California Grants·California

Top match · 77%

Proposition 1 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

California Grants·California

74% match

Proposition 4 – Water Recycling

Closes 6/30/2030Opened 7/6/2026

Town of Eatonville·Florida

74% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

California Grants·California

74% match

Proposition 68 – Water Recycling

Rolling / TBD closeOpened 6/4/2025

Jackson County Utility Authority·Mississippi

71% match

WJC Process Improvements Phase 1

Closes 12/8/2026Opened 8/16/2026

The Metropolitan Water District of Southern California·California

70% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

City of Sanibel·Florida

70% match

WASTEWATER COLLECTION SYSTEM REPAIRS - PHASE 1

Closes 11/12/2026Opened 10/13/2026

California Grants·California

70% match

Proposition 13 – Water Recycling – Planning Grant

Rolling / TBD closeOpened 6/4/2025

California Department of Transportation·California

70% match

Construct sound wall, drainage, and electrical.

Closes 12/1/2026Opened 10/26/2026

City of Redlands·California

70% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

West County Wastewater·California

70% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Bellevue·Washington

70% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of Rockford·Illinois

70% match

LEAD SERVICE LINE REPLACEMENT PHASE 11G

Closes 11/2/2026Opened 9/14/2026

City of Riverside·California

70% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Riverside Transit Agency·California

70% match

Deionized Water Services

Closes 11/19/2026Opened 10/29/2026

Tarrant Regional Water District·Texas

70% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

California Grants·California

69% match

Clean Water State Revolving Fund (CWSRF) Program

Rolling / TBD closeOpened 3/5/2025