Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Washington
  4. ›Construction
  5. ›2027 Phase 1 Water Main Replacement

City of Bellevue·Washington

2027 Phase 1 Water Main Replacement

Closes 11/12/2026$7M – $7.7MInvitation for BidLogin required
Get bids like this by emailBid source

Description

This City of Bellevue contract calls for the design‑build replacement of approximately 10,820 linear feet of ductile‑iron water mains, associated fire hydrants, service connections, and two pressure‑reducing‑valve stations, along with extensive site work, utility relocation, asbestos pipe abandonment, de‑watering, traffic control, and surface restoration. The project must meet a 15 % apprentice utilization requirement and be completed within 310 calendar days after notice to proceed. The engineer’s estimate places the contract value between $7 million and $7.7 million. • Construct ~10,820 LF of ductile‑iron water mains • Install new fire hydrant assemblies and water service connections • Build two PRV stations in concrete vaults • Perform de‑watering, utility relocation, and asbestos‑cement pipe abandonment • Restore asphalt, concrete curbs, gutters, and sidewalks after trench work • Provide traffic control and a certified Traffic Control Supervisor on‑site • Comply with a 15 % apprentice utilization requirement • Complete all work within 310 calendar days • Estimated contract value: $7.0 M – $7.7 M

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kelly Dang(Bid Contact)

[email protected]

(425) 452-4870

Key dates

Opened
10/22/2026
Closes
11/12/2026
Duration
310 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
26043

Budget estimate

$7,000,000 – $7,700,000

The engineer’s estimate range for this project is $7.0 million to $7.7 million, which represents the anticipated contract award amount. Assuming the winning bidder receives the full contract value, the budget will fall within that range. Factors influencing the final payment include any change orders, unforeseen site conditions, and the bidder’s ability to meet the apprentice utilization requirement, which could affect labor cost calculations.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Bellevue·Washington

Top match · 89%

PRV Replacements 2026 Phase 1 PRV 108

Closes 11/19/2026Opened 10/29/2026

Massachusetts Town of Westborough·Massachusetts

86% match

27-2100 IFB Route 9 Water Main Rehabilitation-Phase I

Closes 11/19/2026Opened 10/28/2026

City of Riverside·California

84% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of Daytona Beach·Florida

84% match

2701TB - Tomoka Farms Road & Bellevue Avenue Watermain Realignment Project

Closes 11/5/2026Opened 10/1/2026

Georgia City of Cartersville·Georgia

84% match

Project: Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

City of Ontario·California

84% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Goodwyn Mills Cawood·Georgia

84% match

Mechanicsville & Jones Mill Road Water Main Replacement

Closes 11/12/2026Opened 10/1/2026

Western Virginia Water Authority·Virginia

83% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Bristol Virginia Utilities Authority·Virginia

83% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

City of Grand Forks·North Dakota

83% match

2027 Lead Service Line Replacement

Closes 11/19/2026Opened 10/29/2026

City of Bellevue·Washington

83% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

City of Redlands·California

83% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of Edmond·Oklahoma

83% match

WC24-00005 NE Complex Phase 1 (Danforth Tower Relocation)

Closes 11/18/2026Opened 10/22/2026

City of Charlotte·North Carolina

83% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

Village of Wilmette·Illinois

82% match

2027 Water Main Replacement Construction Engineering Services

Closes 11/4/2026Opened 10/15/2026

City of Philadelphia·Pennsylvania

82% match

PW Bid 2505- RELAY of WATER MAINS in ADAMS AVE from E. WINGOHOCKING ST. to 250' NORTH of UNITY ST

Closes 11/10/2026Opened 10/28/2026

City of Spokane·Washington

82% match

Removal and Replacement of Water Pump Station Doors - Phase 1

Closes 11/10/2026Opened 10/21/2026

Western Virginia Water Authority·Virginia

81% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

81% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Montgomery County OH·Ohio

81% match

Water Main Repair Services Price Agreement

Closes 11/4/2026Opened 10/9/2026