This contract is for the reconstruction and improvement of Mann Road and Ben Howard Road in Snohomish County, Washington. It encompasses complete site preparation, earthwork, grading, drainage and storm‑sewer upgrades, asphalt paving, erosion control, native‑plant roadside restoration, and full traffic‑control installations. The project is funded primarily by a FEMA grant and was awarded on a lump‑sum basis to Konnerup Construction Inc for $3,494,702.
• Scope includes excavation, unsuitable‑foundation removal, gravel borrow, stream‑bed sediment and cobble placement, HDPE storm‑sewer pipe, catch basins, geogrid‑reinforced walls, hot‑mix asphalt surfacing, and extensive erosion‑control and planting.
• Required certifications cover federal‑aid compliance, non‑collusion, debarment status, and wage‑payment statutes; a 5 % bid bond is mandated.
• The solicitation was open competition with seven bidders; only Konnerup received the award.