Binghamton University is seeking a qualified consultant to perform a portion of the design services for Roosevelt Hall. Roosevelt Hall is one of three other dorms located in the Hinman Community that is due for retrofits, and finish updates. The building's gross square footage is 44,034. The dorm consists of 100 bedrooms, each with two beds per room. There are to be 38 bathrooms,each with a shower, sink, and toilet. There will be a new kitchen off the main communit lounge, and new laundry room on the ground floor. Overall, the dorm will undertake a level 3 alteration. Beyond major internal selective demo, it will include two elevator cabrefurbishment, new roofing, new windows, asbestos abatement, new emergency generator with enclosure, new hydronic systems with new ductwork runs, new fire protection systems, and new lighting, controls and main switch gear.
The Facilities Management team will be responsible for all components of the architectural, mechanical and site/civle design work include all utility connections. Our electrical scope of work will also incorporate any information that Telecom or IT needs to include to support this project, The design consultant team will be responsible for
Asbestos Material Testing
Structural
Plumbing
Fire Protection
Door Hardware
Cost Estimator
Energy Consultant (Executive Order 22)
Interested Firms must request an RFQ from
[email protected]
You must request a copy of the RFQ from the university for your submission to be considered responsive
Submission will be electronic. Submissions will be rated on the following criteria: Firm's Qualifications & Experience, Personnel Qualifications & Experience, Previous Experience with Work Specific to the Project Scope, Approach and Capability, MWBE Utilization and References
Business enterprises awarded an identical or substantially similar procurement contract within the past five years:
None
Service-Disabled Veteran-Owned Business (SDVOB)
SDVOB Goal: 6.00%
Minority / Women Business Enterprise contracting goals (MWBE)
MBE Goal: 15.00%
WBE Goal: 15.00%