The Town of Prescott Valley sought bids for the Annual CMP Culverts FY19/20 contract, with a non-mandatory pre-bid conference held on April 18, 2019. The contract involves the supply of corrugated metal pipe culverts. The town reserves the right to accept or reject any or all bids. Key aspects of the contract include the bid submission date, pre-bid conference, and delivery information.
• The bid submission date was May 13, 2019, at 3:30 p.m. MST.
• A non-mandatory pre-bid conference was held on April 18, 2019, at 3:00 p.m. Arizona MST.
• Bids were to be clearly marked and received no later than the specified date and time.
• The town reserves the right to accept or reject any or all bids.
• The contract involves the supply of corrugated metal pipe culverts.