The West Pass Creek YCT Restoration project involves the restoration of West Pass Creek. The contract was awarded to LJS CONCRETE & EXCAVATING, INC. with a base bid of $223,359.00. The project includes the restoration of the creek, and the contract was awarded through a competitive bidding process. Key aspects of the contract include:
• The contract was awarded on April 25, 2019, at 2:00 pm.
• The project manual and construction drawings are available for download.
• A pre-bid meeting was held on April 15, 2019, at 10:30 am, and a site visit was mandatory for bidders.
• The contract includes a 10% bid bond or check.
The contract's scope of work and requirements are outlined in the project manual and construction drawings, which are available for download.