The Lopez Tank Replacement Project involves replacing an existing tank with a new one, including upgraded controls, cathodic protection, and current design standards. The project has an engineer's estimate of $1,162,700. The contract was awarded through a formal bid process, with three bidders submitting proposals. The bid results show the prices for each item, with the total base bid ranging from $1,245,016 to $1,873,186.
• The project includes construction area signs, job site management, water pollution control program, erosion control measures, clearing and grubbing, and other items.
• The contract has a lump sum payment structure.
• The project is located at Lopez Lake, California.
• The bid submission date was July 11, 2024, at 6:00 PM EDT.