The contract is for the Canal Street WWTF Dewatering System, which involves removing existing foundations, concrete, and asphalt, and installing a new pre-engineered canopy structure, yard piping, and a skid-mounted belt filter press. The contract also includes connecting power, controls, and appurtenances to the belt filter press system. The scope of work includes mobilization, demobilization, site civil improvements, and field locate, excavation, removal, and disposal of unsuitable material. The contract was awarded to five vendors, each with a different bid amount and completion time. The key information to help the client decide how similar this contract is to their own business specialties includes the type of work involved, the location, and the vendors awarded the contract.
• The contract involves construction and installation work.
• The location is Leesburg, FL.
• The vendors awarded the contract are L7 Construction, Sawcross, Inc., TLC Diversified, Inc., Villages Construction, Inc., and Censtate Contractors, Inc.
• The bid amounts range from $38,000 to $887,500.
• The completion times range from 270 to 365 calendar days.