The City of Wilmington is procuring a municipal interior renovation of the fourth floor of the Skyline Center building. The scope includes demolition and reconstruction of metal‑framed gypsum demising walls (225 lf base, plus an optional 110 lf alternate), installation of three interior entrances, sidelites, and window units, and a tenant‑fit‑out of approximately 1,840 sf in Suite D as an optional alternate. Architectural addenda specify door veneer material, acoustic ceiling tile, and floor‑finish unit pricing ($7/sf carpet tile, $8/sf LVP). Engineering alternates cover relocation of electrical devices and demising‑wall adjustments. The project is a sealed‑bid, single‑prime solicitation with a 5 % bid bond requirement and a 14 % M/WBE subcontracting goal. The construction period is fixed at 120 calendar days (plus a 20‑day final completion window) with liquidated damages of $385 per day for overruns.