This contract calls for extensive sewer and lateral rehabilitation in the North Meadows area of Hartford, Connecticut. The work includes curing‑in‑place pipe (CIPP) lining of roughly 22,750 linear feet of sewer main, CCTV inspection of the same length, reconnection of about 600 active service laterals, installation of new precast concrete manholes, monolithic cementitious lining of manholes, chimney rehabilitation, and numerous point repairs and cleanouts. The scope is detailed in Section 01010 of the bidding documents and requires full labor, equipment, permits, and related costs. The project is mandatory to be bid through an Invitation‑to‑Bid (ITB) process, with a pre‑bid conference and a sealed‑bid opening on January 25 2024. The Metropolitan District will award the contract after the bid opening, with the award date recorded as June 27 2024.
• Approx. 22,750 LF of CIPP lining and CCTV inspection
• Reconnection of ~600 service laterals and installation of 11 new precast manholes
• Required attendance at a mandatory pre‑bid conference and sealed‑bid submission by 1/31/2024
• Project location: City of Hartford, CT
Attached files
The award documents live at the source — open the contract source above to download them.