The contract is for the basement renovation at Landon Middle School. The project includes the renovation of the basement, with the base bid scope including the renovation as scheduled and shown on the architect's/engineer's plans. There are also add alternates, including the installation of Kinetex Carpet Tiles and the replacement of the existing 2x2 ceiling grid with a new 2x4 ceiling grid. The contract was re-bid after the original bid exceeded available funding, and contractors may bid on the entire bid package or on individual line items. The key aspects of the contract include:
• Renovation of the basement at Landon Middle School
• Base bid scope includes renovation as scheduled and shown on the architect's/engineer's plans
• Add alternates include installation of Kinetex Carpet Tiles and replacement of the existing 2x2 ceiling grid
• Contract was re-bid after original bid exceeded available funding
• Contractors may bid on the entire bid package or on individual line items