The contract is for the SPMUD - Root Control Program 2022, which involves applying chemical root treatment to 136 mainline pipe segments with diameters ranging from 4-inch to 18-inch and a total length of 34,040 feet. The contractor shall furnish all labor, equipment, materials, plant, and supervision to perform the work. The owner will perform pre-treatment root cutting at least 6 weeks prior to application of the product. The contract was awarded to Dukes Root Control Inc with a base bid amount of $52,394.70.
• The project scope of work includes applying chemical root treatment to mainline pipe segments.
• The contractor shall furnish all labor, equipment, materials, plant, and supervision to perform the work.
• The owner will perform pre-treatment root cutting at least 6 weeks prior to application of the product.
• The contract was awarded to Dukes Root Control Inc with a base bid amount of $52,394.70.