The City of Vancouver has awarded a contract to SAK Construction, LLC for the E-Interceptor Rehabilitation Phase 1 and 2A CIPP Sewer Rehabilitation project. The project involves the rehabilitation of approximately 4,225 lineal feet of 54-inch and 363 lineal feet of 48-inch Cured-In-Place Pipe (CIPP) to rehabilitate existing sanitary sewer mains. The contractor will also rehabilitate 9 manholes with epoxy lining for corrosion prevention. The project is expected to be completed within 70 working days. The contract value is approximately $4,530,818.18.
• The project includes the installation of CIPP, customer notification, bypass pumping, odor control, cure water treatment, cleaning, root and sediment removal, initial Closed-Circuit Television (CCTV) inspection and assessment, CIPP installation and testing, reinstatement of all laterals, testing, and final CCTV inspection.
• The contractor is required to comply with all relevant federal, state, and municipal laws, rules, and regulations.
• The contract includes provisions for payment, indemnification, and termination.
• The City of Vancouver reserves the right to terminate the contract for convenience or default.