This contract is for the replacement of siding, insulation, and windows on the east side of the Burnett Administration Center. The base bid scope includes removing and replacing existing siding, trim, insulation, plywood sheathing, and windows. The contract also includes an add alternate scope for residing a small shed and replacing a rusty metal door and steel frame. The total bid amount is $131,000.00, with a total accepted amount of $113,200.00.
• The contract is for a construction project
• The project includes replacement of siding, insulation, and windows
• The contract has a base bid scope and an add alternate scope
• The total bid amount is $131,000.00
• The total accepted amount is $113,200.00