Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Civil Engineering
  5. ›RFQ: 38th and Monaco Intersection Improvements

Awarded contract·City and County of Denver·Colorado

RFQ: 38th and Monaco Intersection Improvements

Won by DAVID EVANS AND ASSOCIATES, INC.$3MAwarded 1/29/2026Single Award
Contract source

Awarded vendors

  • DAVID EVANS AND ASSOCIATES, INC.

Description

This contract concerns the design‑build of safety and operational upgrades at the 38th & Monaco intersection in Denver, Colorado. The scope includes complete traffic‑signal reconstruction, signal‑timing modifications, redesign of turn‑lane geometry, relocation of a crosswalk, installation of enhanced pedestrian signals, ADA‑compliant curb‑ramps, and resurfacing of all impacted pavement areas. The project aims to reduce crashes on a high‑injury‑network corridor, improve access for people with disabilities, and replace aging signal equipment. The City and County of Denver’s Department of Transportation & Infrastructure selected David Evans and Associates, Inc. as the awardee. The solicitation was an RFQ with a competitive bidding deadline of 16 September 2025 and the award was issued on 29 January 2026. The contract includes a mandatory 12 % Disadvantaged Business Enterprise participation requirement but does not specify a set‑aside. • Traffic signal replacement (poles, mast arms, heads, controllers) • Geometry changes to right‑turn slip lanes and new crosswalk location • ADA‑compliant curb ramps and pedestrian signal upgrades • Pavement milling and resurfacing of the impacted intersection area

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Questions due
9/5/2025
Pre-bid meeting
8/20/2025
Bids closed
9/16/2025
Intent to award
1/29/2026
Awarded
1/29/2026

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Solicitation
Request for Qualification
Industry
Civil Engineering
NAICS
237990
Solicitation №
202580693

Contract value

$3,000,000

The documents do not disclose a dollar value. Intersection reconstruction projects of this scale in a major city typically range from $2 million to $5 million, depending on signal equipment, pavement work, and ADA upgrades. Considering the extensive signal replacement, lane re‑geometry, crosswalk relocation, and resurfacing, a mid‑range estimate of roughly $3 million is reasonable. This estimate assumes standard equipment costs, typical labor rates for Denver, and a moderate amount of pavement work.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Carmel·Indiana

Top match · 72%

Intersection Improvements - 106th Street & Lakeshore Drive East

Closes 11/18/2026Opened 10/29/2026

City of Charlotte·North Carolina

72% match

Wilkinson Blvd. Intersection Improvements

Rolling / TBD closeOpened 2/8/2027

City of Smithville·Missouri

71% match

RFP 26-07 Bridge Street Roundabout Improvements

Closes 11/3/2026Opened 9/29/2026

City of Charlotte·North Carolina

71% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

Massachusetts City of Brockton·Massachusetts

71% match

BID FOR: Intersection Improvements at Two Locations: Pleasant St at Spring St and Main St at Nilsson

Closes 11/19/2026Opened 10/22/2026

City of Moline·Illinois

70% match

Ave. of the Cities & 53rd St. Intersection Project

Closes 11/10/2026Opened 10/25/2026

Georgia City of Albany·Georgia

70% match

27-024 Intersection Improvements

Closes 11/10/2026Opened 10/6/2026

City of Ontario·California

70% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

State of Hawaii Department of Transportation – Highways Division·Hawaii

69% match

NH-019-2(076) HILO BAYFRONT HWY INTERSECTION IMPROVEMENTS

Closes 11/10/2026Opened 10/12/2026

City of Fort Smith·Arkansas

69% match

Traffic Signal Improvements Phase A – 2024 Capital Improvements Program

Closes 11/10/2026Opened 10/25/2026

City of Fort Smith·Arkansas

69% match

TRAFFIC SIGNAL IMPROVEMENTS 25-09-A

Closes 11/10/2026Opened 10/21/2026

Maryland State Highway Administration·Maryland

69% match

PGA435176 - MD 414 (St. Barnabas Road) from IS 95 Ramp 2 to MD 5 Ramp 5 Safety

Closes 12/3/2026Opened 10/27/2026

City of Albany·Georgia

69% match

Intersection Improvements

Closes 11/10/2026Opened 10/6/2026

City of Seattle·Washington

69% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

City of Vernon·California

68% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Carrollton·Texas

68% match

Josey-Parker Intersection Improvements

Closes 11/5/2026Opened 10/15/2026

Massachusetts Department of Transportation·Massachusetts

68% match

611974 MEDFORD FAP No. HSI/HSI(VUS)-003S(991)X Intersection Improvements at Main Street/South Stre

Closes 11/10/2026Opened 9/14/2026

NYS East Fishkill, Town of·New York

68% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

City of Charlotte·North Carolina

68% match

Shamrock Drive Complete Street

Rolling / TBD closeOpened 4/1/2027

Virginia Department of Transportation·Virginia

68% match

B25_2027 SMART SCALE - INTERSECTION IMPROVEMENTS

Closes 11/18/2026Opened 10/14/2026

City of Richmond Government·Virginia

68% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Idaho Transportation Department·Idaho

68% match

Key No. 23883 2ND STREET S SAFETY IMPROVEMENTS

Closes 11/3/2026Opened 10/10/2026

City of Stillwater·Oklahoma

68% match

10th Avenue and Main Street Improvements Project 26TR12

Closes 11/4/2026Opened 10/10/2026

City of Charlotte·North Carolina

68% match

Rea Road Widening (I-485 to Williams Pond Lane)

Rolling / TBD closeOpened 3/6/2026

City of Gillette·Wyoming

68% match

SAKO - KIMBER INTERSECTION IMPROVEMENTS

Closes 11/4/2026Opened 10/20/2026