The contract is for the 124TH AVE NE – NE 8TH ST TO NE 12TH ST SAFETY IMPROVEMENTS project, which includes work such as clearing and grubbing, removing trees, removing asphalt pavement, and constructing cement concrete curb, gutter, and sidewalk. The engineers' estimated range for the project is $650,000 to $670,000. The contract was awarded to multiple vendors, with the lowest bid being $512,800.80 from R. W. Scott Construction. The project involves various tasks, including construction surveying, roadway excavation, and installation of illumination systems. The contract documents include a bid tabulation, plans, and specifications.
• The project involves safety improvements to the 124th Avenue NE corridor.
• The work includes clearing and grubbing, tree removal, and pavement removal.
• The contract requires the construction of cement concrete curb, gutter, and sidewalk.
• The project also involves the installation of illumination systems and traffic control devices.
• The contract was awarded to multiple vendors, with the lowest bid being $512,800.80.
• The engineers' estimated range for the project is $650,000 to $670,000.