This contract calls for a comprehensive wet‑method demolition and site remediation at 251 Rylands Street, Mobile, AL. The contractor must demolish all structures, cap utilities, remove debris, control erosion, manage lead‑based paint and asbestos waste, and restore the site with seed, topsoil, and mulch while preserving an existing aluminum fence. All work must begin within three business days of a Notice to Proceed and be completed, documented, and invoiced within thirty calendar days. The scope includes strict environmental compliance, required documentation, and a $250 per day liquidated‑damage provision for late completion.
• Wet demolition of structures, footings, slabs, and vegetation (trees ≤ 8 in.)
• Utility disconnection and capping (sewer, water, gas) with notification to the agency
• Environmental controls: BMPs, dust suppression, LBP/ACM disposal, erosion/sediment measures
• Post‑completion documentation: photos, waste‑shipment records, newspaper notice, AIA forms, insurance certificates
• Tight schedule: start within 3 business days, finish within 30 calendar days, $250/day penalty for delays.