The contract is for the replacement of bathroom and shower floors at A418 and B416 - Kane McKeesport II. The project involves a lump sum bid for the replacement work, with a total estimated cost of $29,000. The contract was awarded to Allegheny Installations, and the period of the contract is from December 1, 2017, to March 31, 2018. The key aspects of the contract include the scope of work, which involves bathroom and shower floor replacement, and the contract value, which is $29,000.
• The contract was awarded through a Request for Quotations (RFQ) process.
• The contract is for a specific project, with a defined scope of work and a fixed contract value.
• The contract was awarded to a single vendor, Allegheny Installations.
• The contract has a specific start and end date, with a duration of 120 days.