Awarded vendors
- J.A. Polito & Sons
Description
This municipal contract calls for the comprehensive rehabilitation, reconstruction, and replacement of sanitary and surface sewer lines, manholes, and associated water mains across several Worcester streets (Pleasant St., Field Way, Volkmar Rd., Chandler St.). The scope includes extensive earthwork, pipe installation (PVC, ductile‑iron, HDPE), manhole construction, temporary bypass pumping, dewatering, traffic‑control, erosion‑ and sediment‑control, and detailed as‑built documentation. The work must be completed within 340 calendar days from award, with strict compliance to Massachusetts General Laws, safety standards, and environmental protections.
• 3,145 ft of sewer mains, 43 new manholes, 12 reconstructed manholes, and 24 sewer plugs.
• Temporary bypass pumping and dewatering systems, TV inspections, and full traffic‑control plans.
• Mandatory 5 % bid deposit, 100 % performance/pay bonds, and detailed payroll/ workforce reporting.