The Village of Hoffman Estates contracted a turn‑key design‑build installation of high‑performance resinous flooring for the NOW Arena. The project requires removal of existing floor systems, concrete substrate preparation to specific surface profiles, and the application of two resinous flooring systems (cementitious urethane and methyl‑methacrylate) across arena, kitchen, storage, cooler, freezer, and concession spaces. The work must be completed within a tight 17‑day window in August 2026. Concare Inc. was selected as the sole awardee, and the contract includes bonding, insurance, prevailing‑wage, and warranty requirements.
• Scope includes full demolition, concrete prep, two distinct resinous floor systems, and post‑installation warranties (3‑year on‑site labor & material).
• Mandatory pre‑bid meeting on 8 May 2026; bid opening on 1 June 2026; awarded contractor must provide a 10 % bid deposit and a 100 % performance bond.
• Work schedule: start 12 Aug 2026, complete by 28 Aug 2026 (17 days), with strict cure times and safety controls for MMA application.