Awarded vendors
- CORE Construction
Description
The contract is for utility relocation and pavement improvement at the Northwest Fire District Training Center. The project involves improving the durability and drainage of the training drive area, which has had problems since its construction in 2010-2011. The scope of work includes relocating utility infrastructure and installing a new subbase and surfacing material. The contract was awarded to CORE Construction. Key considerations for this contract include the need for a durable and draining surface, the importance of proper utility infrastructure installation, and the requirement for compliance with engineering documents and technical specifications.
• The training drive area is used for firefighter training and requires a surface that can withstand heavy use and high-pressure firefighting nozzles.
• The existing subbase and surfacing material are inadequate and need to be replaced.
• The utility infrastructure needs to be relocated to allow for proper installation of the new subbase and surfacing material.
• The contract requires compliance with engineering documents and technical specifications.
• The project is being done in phases due to funding constraints.