Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wisconsin
  4. ›Construction
  5. ›County JJ Reconstruction

Awarded contract·Outagamie County·Wisconsin

County JJ Reconstruction

$4.7MSingle Award
Contract source

Description

The County Trunk Highway JJ (CTH JJ) Reconstruction project (Project 582500) in the Village of Hortonville, Outagamie County, WI, calls for a full reconstruction of the highway corridor, replacement of the Black Otter Creek bridge, removal and replacement of existing roadway pavement, curbs, gutters, sidewalks, and the installation of new storm‑sewer, water, and sanitary‑sewer utilities. Additional scope includes upgraded pedestrian accommodations, ADA‑compliant curb ramps, detectable‑warning surfaces, and an optional “Memorial Square” alternate design. Bids were submitted on a unit‑price basis; three firms (Vinton Construction Company, MCC, NEA) provided total estimates ranging from approximately $4.2 M to $4.7 M including the alternate. The solicitation was a sealed‑bid, competitive procurement with mandatory pre‑qualification by WisDOT, a bid security of at least 10 % of the maximum bid price, and a 5 % retainage. The contract is governed by Outagamie County’s procurement rules and includes extensive environmental and safety requirements (WDNR storm‑water permit, erosion‑control inspections, wildlife protection windows, and detailed insurance/indemnification clauses). • Scope: roadway reconstruction, bridge replacement, utility relocation, storm‑sewer, water & sanitary‑sewer upgrades, pedestrian improvements, and an optional memorial‑square site‑improvement. • Procurement: sealed‑bid, unit‑price schedule, pre‑qualified bidders, 90‑day bid validity, 10 % bid security, 5 % retainage, full compliance with WisDOT and WDNR regulations. • Key dates: Addendum 1 posted March 6 2026, Addendum 2 posted March 11 2026, bid results posted March 12 2026.

Attached files

Key dates

Bids closed
3/12/2026
Contract modified
3/11/2026

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
HWY CTHJJREC

Contract value

$4,700,000

The bid results provide line‑item totals for each bidder. Using the most comprehensive total (roadway + bridge + sanitary/water + alternate) for Vinton Construction Company yields approximately $4,462,816. Adding a modest contingency (≈5 %) for change orders and inflation typical of public works brings the estimated contract value to roughly $4.7 million. This ballpark aligns with similar CTH reconstruction projects in Wisconsin, which normally range from $3 M to $6 M depending on bridge size and utility scope.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Somerset County·New Jersey

Top match · 62%

REHABILITATION OF COUNTY BRIDGE NO. F1306 RIPPLING BROOK WAY OVER TRIBUTARY OF MINE BROOK, BOROUGH OF BERNARDSVILLE, SOMERSET COUNTY, NEW JERSEY

Closes 11/5/2026Opened 10/15/2026

Somerset County·New Jersey

61% match

REHABILITATION OF COUNTY BRIDGE NO. F0807 DAVENPORT STREET OVER PETERS BROOK, BOROUGH OF SOMERVILLE, SOMERSET COUNTY, NEW JERSEY

Closes 11/5/2026Opened 10/14/2026

Texas Jefferson County·Texas

61% match

Garth Road Reconstruction Phase 1

Closes 11/4/2026Opened 10/13/2026

Shawnee County·Kansas

60% match

Construction of NW Maple Hill over Kansas River

Closes 12/2/2026Opened 10/26/2026

Gwinnett County Government·Georgia

60% match

Tribble Mill Dam No. 2 (Chandler Lake) Rehabilitation

Closes 12/9/2026Opened 10/21/2026

Texas Burnet County·Texas

60% match

CR 337 & CR 340 Restoration Project

Closes 11/18/2026Opened 10/30/2026

Gwinnett County Government·Georgia

60% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

Siskiyou County California·California

59% match

Jackson Ranch Road Rehabilitation

Closes 11/11/2026Opened 4/24/2026

Jackson County Board of County Commissioners·Florida

59% match

ITB 2627-02 - Milling, Resurfacing Old US Road-CR 167 FPID 453534-1-54-01

Closes 11/5/2026Opened 10/1/2026

Sedgwick County·Kansas

59% match

Construct New Juvenile Services Building

Closes 11/17/2026Opened 9/21/2026

Beaufort County, SC·South Carolina

59% match

Beaufort County 2027 Resurfacing

Closes 11/17/2026Opened 10/16/2026

Beaufort County·South Carolina

59% match

Beaufort County 2027 Resurfacing

Closes 11/17/2026Opened 10/16/2026

Jackson County Board of County Commissioners·Florida

58% match

2627-07 - Seminole Drive Reconstruction

Closes 11/19/2026Opened 10/15/2026

Carver County·Minnesota

58% match

Township Bridge Replacements

Closes 11/3/2026Opened 10/9/2026

County of Chester·Pennsylvania

58% match

Bridge Rehabilitation for County Bridge #190

Closes 11/25/2026Opened 10/22/2026

Texas Department of Transportation·Texas

58% match

STATE LET CONSTRUCTION CONTRACT, COLLIN CO, RECONSTRUCT & WIDEN 2 LN RURAL HWY TO 4 LN URBAN

Closes 11/4/2026Opened 10/7/2026

Connecticut Dept. of Transportation·Connecticut

58% match

Rehabilitation of Bridge Nos. 06200A and 06200B (Baldwin Bridge) I-95 NB and SB

Closes 11/4/2026Opened 8/19/2026

Gwinnett County Government·Georgia

58% match

Patterson Pump Station Rehabilitation

Closes 12/8/2026Opened 10/21/2026

Harris County Municipal Utility District No. 495·Texas

58% match

Channel Unit No. U101-11-00 Extension and Rehabilitation to serve Harris County Municipal Utility District No. 495

Closes 11/12/2026Opened 10/9/2026

Jasper County·South Carolina

58% match

Basketball Court Renovation and Repair

Closes 11/18/2026Opened 10/2/2026

Jefferson County, AL - Department of Roads and Transportation·Alabama

58% match

Contract Resurfacing 2027 – Group 1

Closes 11/17/2026Opened 10/16/2026

Hardin County·Kentucky

58% match

Horseshoe Bend Road Bridge Repairs

Closes 11/2/2026Opened 10/22/2026

Eau Claire County Purchasing·Wisconsin

58% match

Court Commissioner & TRY Mediation Renovation

Closes 11/12/2026Opened 10/12/2026

Gulf County Board of County Commissioners·Florida

58% match

Bid #2627-03 CR381 Resurfacing Project

Closes 11/12/2026Opened 10/8/2026

Ramsey County·Minnesota

58% match

Ramsey County Courthouse Exterior Facade Restoration

Closes 11/12/2026Opened 10/8/2026