This contract covers the design‑build construction, demolition, and installation of seven traffic signal intersections in Denver, funded through Mill Levy 12. The scope includes removal of existing pavement, curbs, sidewalks, and storm‑drain infrastructure; installation of new concrete pavement, asphalt, curb‑and‑gutter, and curb ramps; and full traffic‑signal system upgrades (controllers, cabinets, LED luminaires, signal faces, detection cameras, telemetry, and power‑backup equipment). The project also requires erosion‑control measures, temporary traffic‑control devices, and associated civil‑engineering work. The contract was awarded to Sturgeon Electric Company, Inc. for a total value of approximately $2.94 million and carries a 365‑day performance period.
• Traffic‑signal hardware (controllers, cabinets, LED heads, detection cameras)
• Civil works (pavement, curb, sidewalk, drainage, erosion control)
• Comprehensive temporary traffic‑control and safety measures