This contract awards a fixed‑price demolition and site‑remediation project at 815 Stanton Road, Mobile, AL. The contractor must perform wet‑method demolition of existing structures, cap and disconnect all sanitary sewer, water, and gas lines, and remove all debris including tires, vegetation, and hazardous materials. Environmental compliance includes lead‑based paint and asbestos NESHAP requirements, as well as the installation and maintenance of erosion‑ and sediment‑control BMPs, followed by permanent site stabilization (seeding/mulching). The scope also mandates submission of photographic documentation, waste‑shipment records, and a final notice of completion published in a local newspaper, along with all required close‑out affidavits and insurance paperwork.
• Wet‑method demolition of structures, footings, slabs, etc.
• Utility capping (sanitary sewer, water, gas) and full site cleanup, including hazardous material handling.
• Erosion‑control BMPs and permanent stabilization, plus required documentation and final notice publication.