The contract is for the demolition and asbestos abatement of a single-story, wood structure located at 118 N. 3rd Street in Temple, Texas. The asbestos abatement consists of abating approximately 936 square feet of asbestos-containing floor tile and mastic using the Resilient Floor Covering Institute (RFCI) Method. The contract was awarded to Sierra Contracting Corp. for a total of $6,775.00. Key aspects of the contract include:
• Demolition of a wood structure
• Asbestos abatement
• Asbestos-containing floor tile and mastic removal
• Use of the Resilient Floor Covering Institute (RFCI) Method
• Contract value: $6,775.00