The City of Spokane’s “Make Beacon Hill Public – Phase 2” project is a public‑works construction contract for the enlargement and improvement of two primitive‑dirt parking lots and trailhead facilities at John H. Shields Park and Camp Sekani Park. The work includes site clearing, grading, utility installation, concrete and asphalt paving, lighting, ADA‑compliant pedestrian crossings, optional water‑service extensions, parking additions, a prefabricated restroom building, and rock‑excavation. The contract was awarded to Liberty Concrete LLC on a lump‑sum basis and is subject to Washington prevailing‑wage and Buy‑America requirements, with a required 5 % bid bond and 100 % performance/payment bonds. The project must achieve substantial completion at Shields Park by 18 July 2025 and at Sekani Park by 7 Nov 2025, with a 10‑day notice‑to‑proceed window and liquidated‑damages provisions.
• Base‑bid scope covers site preparation, parking‑lot construction, lighting, signage, and landscape restoration.
• Six optional alternates (water service, pedestrian crossings, additional parking, restroom, rock excavation) can be priced separately.
• Contractor must comply with extensive permitting (shoreline, floodplain, obstruction), tree‑protection, cultural‑resource monitoring, and erosion‑control requirements.