Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Montana
  4. ›Construction
  5. ›Overlay North Frontage Road Billings Area

Awarded contract·Montana Department of Transportation (MDT)·Montana

Overlay North Frontage Road Billings Area

Won by JTL GROUP INC. +1 more$1.5MMultiple Award
Contract source

Awarded vendors

  • JTL GROUP INC.
  • HOLLOW CONTRACTING INC.

Description

The Montana Department of Transportation (MDT) is soliciting bids for the Overlay North Frontage Road Billings Area project. The project involves pavement preservation services, including asphalt mix materials, highway maintenance, and road oil. The contract will be awarded to the successful bidder, with JTL GROUP INC. and HOLLOW CONTRACTING INC. listed as the apparent successful offerors. The contract terms and conditions, including payment terms, bid security, and contract performance security, are outlined in the solicitation documents. Key aspects of the project include: • Pavement preservation services • Asphalt mix materials • Highway maintenance • Road oil • Contract terms and conditions • Payment terms • Bid security • Contract performance security The project requires the contractor to be registered with the Department of Labor and Industry, and to comply with various requirements, including nondiscrimination and disability accommodation notice requirements.

Attached files

Key dates

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
MDT-316014-RP

Set-asides

Economically Disadvantaged WOSB (EDWOSB)

Contract value

$1,500,000

The contract value can be estimated based on the quantities of materials and services required for the project. The contract involves 3,875 tons of 3/4" commercial plant mix grade S PG 58H-34, 1,133 square yards of mobilization, and other items. Assuming an average cost of $100 per ton for asphalt mix materials and $50 per square yard for mobilization, the total cost for these items would be approximately $387,500 for asphalt mix materials and $56,650 for mobilization. Adding other costs, such as labor, equipment, and overhead, the total contract value could be estimated to be around $1 million to $2 million. However, this is a rough estimate and the actual contract value may be higher or lower, depending on various factors, including the contractor's pricing, the complexity of the project, and the location.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Billings·Montana

Top match · 65%

W.O. 27-23: Grand Avenue – Billings – 41st Street to 62nd Street

Closes 11/20/2026Opened 10/22/2026

U.S. Department Of Transportation·Washington

60% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

City of Shawnee·Kansas

60% match

Ordinance No. 3490

Closes 6/4/2030Opened 6/4/2024

Missouri Department of Transportation·Missouri

60% match

St. Louis District, St. Louis County, Airport Road Multimodal Improvements traffic calming, pavement striping, and installing flexible plastic delineators between North Hanley Road and New Florissant Road

Closes 11/18/2026Opened 10/13/2026

City of Shawnee·Kansas

60% match

Ordinance No. 3508

Closes 10/22/2030Opened 10/22/2024

Montana Department of Transportation·Montana

60% match

Scrub Seal Hodges Road Miles City Area

Closes 11/3/2026Opened 10/1/2026

City of Shawnee·Kansas

60% match

Ordinance No. 3523

Closes 6/3/2033Opened 6/3/2025

U.S. Department Of Transportation·Wyoming

59% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

Nevada Government·Nevada

59% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Minnesota Department of Transportation·Minnesota

59% match

260138 SP 8208-45

Closes 11/18/2026Opened 10/21/2026

City of Shawnee·Kansas

59% match

Ordinance No. 3499

Closes 8/20/2029Opened 8/20/2024

City of Flowood·Mississippi

59% match

Liberty Road to Manship Road Shared-Use Path Overlay STP-0291-00(010) LPA110134/701000

Closes 11/10/2026Opened 10/9/2026

City of Shawnee·Kansas

59% match

Ordinance No. 3509

Closes 10/22/2030Opened 10/22/2024

Idaho Transportation Department·Idaho

59% match

Key No. 22390 VISTA AVE, OVERLAND RD to ROSE HILL ST, BOISE

Closes 11/10/2026Opened 10/14/2026

Idaho Transportation Department·Idaho

59% match

Key No. 24698 DISCOVERY WAY, US 20/26 TO BRIDGER ST, BOISE

Closes 11/10/2026Opened 10/14/2026

City of Harrisonburg·Virginia

59% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Town of South Hill·Virginia

59% match

IFB FY27-01: Asphalt Overlay & Traffic Marking

Closes 11/18/2026Opened 10/21/2026

Idaho Transportation Department·Idaho

59% match

Key No. 23731 NORTHSIDE BLVD & KARCHER RD

Closes 11/17/2026Opened 10/29/2026

Idaho Transportation Department·Idaho

59% match

Key No. 21923 US-26, JCT. HITT ROAD (25th E)

Closes 11/24/2026Opened 10/30/2026

Minnesota Department of Transportation·Minnesota

59% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

City of Shawnee·Kansas

59% match

Ordinance No. 3510

Closes 2/5/2027Opened 11/5/2024

City of North Augusta·South Carolina

59% match

US 25 (Georgia Avenue) Traffic Calming

Closes 11/12/2026Opened 10/26/2026

County of Loudoun·Virginia

58% match

IFB NG00004: Route 15 North Widening: Battlefield Parkway to Montresor Road

Closes 11/20/2026Opened 10/13/2026

Tacoma·Washington

58% match

E Portland Ave (64-72) Overlay

Closes 11/3/2026Opened 9/29/2026

U.S. Department Of Transportation·Colorado

58% match

ND NP THRO 204(1) Buck Hill Road

Closes 11/3/2026Opened 10/1/2026