Description
The 2018 Citywide Bicycle Improvements contract involves the removal and installation of pavement markings and signs, traffic island modifications, installation of sidewalk and a curb ramp, and installation of traffic signal loops. The engineer's estimate for the project is between $200,000 and $250,000. The contract was awarded through a public bid process, with multiple vendors submitting bids. The contract is expected to be completed within a certain duration, but the exact duration is not specified in the provided text.
• The project involves various construction activities, including pavement markings and signs, traffic island modifications, and installation of sidewalk and a curb ramp.
• The engineer's estimate for the project is between $200,000 and $250,000.
• The contract was awarded through a public bid process, with multiple vendors submitting bids.
• The project manager for the contract is Kyle Potuzak.
• The bid contact for the contract is Tom Carroll, who can be reached at (425) 452-6981 or [email protected].