The 2018 Pavement Slurry Seal Project involves the application of a slurry seal to residential city streets and a senior center parking lot, including isolated digouts, crack sealing, and pavement markings. The project was awarded to four vendors: Bond Blacktop Inc, Telfer Pavement Tech, VSS International, and California Pavement Maintenance. The total bid schedule for the project is approximately $157,044.70 to $220,239.31.
• The project includes digout repair, crack sealing, slurry seal application, traffic striping, and pavement markings.
• The senior center parking lot will also receive a slurry seal, crack sealing, and traffic striping.
• The project has a total of four vendors, each with their own bid schedule.
• The total bid schedule for the project ranges from $157,044.70 to $220,239.31.