The budget for this project can be estimated based on the scope of work and the requirements for the construction of the lift station rehabilitation. Considering the project includes mobilization/demobilization, bonds, insurance, bypass pumping of sanitary sewer, demolition of existing pump station, rehabilitation of existing wet well, pump installation, valve vault installation, control panel installation, pipe preparation and coating, bypass connection, concrete, soil erosion and sediment control, construction exit, electrical, mechanical, and other appurtenances, the estimated budget could range from $500,000 to $2,000,000. This estimate is based on the assumption that the project requires significant construction work, including the rehabilitation of the existing lift station and the installation of new equipment. Factors that may influence the likely payment range include the complexity of the project, the materials and labor required, and the location of the project.