Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kansas guideKansas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kansas
  4. ›Energy and Utilities
  5. ›City of Alma Segment 5 Gas Feeder Line Improvements…

City of Alma·Kansas

City of Alma Segment 5 Gas Feeder Line Improvements - Alma, KS

Closes 10/2/2025$500k – $700kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Alma, Kansas is seeking bids for the construction of the Gas Feeder Line Replacement project, which includes the replacement of 6” HDPE gas main through open trench and horizontal directional drilling, as well as service connections, high-pressure connections, and isolation valves. The project is located in Alma, Kansas, and bids will be received at the Alma City Hall until October 2nd, 2025, at 2:00 pm local time. The project engineer, Samuel Johnson, can be contacted with questions about the project. Some key tasks included in the project are: * 6” HDPE Gas Main Open Trench: 5,549 LF * 6” HDPE Gas Main Horizontal Directional Drilling: 1,055 LF * Service Connections: 3 EA * High Pressure Connection to Existing Gas Main: 3 EA * 6” Isolation Valves: 3 EA

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Samuel Johnson(Project Engineer)

[email protected]

Key dates

Opened
9/4/2025
Closes
10/2/2025

Last updated

Details

Type
Invitation for Bid
Industry
Energy and Utilities
NAICS
237120
Solicitation №
24-1346

Budget estimate

$500,000 – $700,000

The budget for this project can be estimated based on the scope of work and the materials required. The project includes the replacement of 6” HDPE gas main, service connections, high-pressure connections, and isolation valves. The total length of the gas main to be replaced is approximately 6,604 LF. Assuming an average cost of $50 per foot for the gas main, the total cost for the gas main would be around $330,200. Additionally, the cost of service connections, high-pressure connections, and isolation valves would add to the total cost. Based on these estimates, the total budget for the project could be in the range of $500,000 to $700,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS Rochester-Genesee Reg. Transportation Authority·New York

Top match · 66%

Fueling Station Electrical Distribution Upgrades

Closes 11/20/2026Opened 10/26/2026

City of Alma·Arkansas

66% match

Alma Southside Sidewalk Improvements

Closes 11/10/2026Opened 10/18/2026

City of Helena·Montana

66% match

Forest Fuel Reduction RFP No. 005

Rolling / TBD closeOpened 4/3/2026

City of Lawrence·Kansas

66% match

MS-220015A Lawrence Pump Station 9 Improvements

Closes 12/8/2026Opened 10/27/2026

Kansas City Area Transportation Authority·Missouri

66% match

Renewable Natural Gas Supplier

Closes 10/31/2026Opened 9/30/2026

City of Missouri City - Purchasing·Texas

66% match

MUSTANG BAYOU WATER PLANT #2 WELL IMPROVEMENTS

Closes 11/6/2026Opened 10/21/2026

Town of Byhalia·Mississippi

66% match

Natural Gas Services for Marshall Trade Center

Closes 12/2/2026Opened 10/29/2026

Alaska Department of Natural Resources (DNR)·Alaska

65% match

TAPS Renewal Application & Public Hearings

Rolling / TBD closeOpened 9/9/2026

City of Fredonia·Kansas

65% match

Distribution System Improvements - Fredonia, KS

Closes 11/12/2026Opened 10/29/2026

City of Dillingham·Alaska

65% match

City of Dillingham, AK Furnish Petroleum Fuels FY27

Closes 11/17/2026Opened 10/27/2026

Power Authority of New York·New York

65% match

Natural Gas Transportation- Richard M. Flynn Power Plant

Closes 12/31/2026Opened 3/27/2024

Irvine Ranch Water District·California

65% match

Wells 6, 12, 14, and 15 Site Improvements

Closes 11/18/2026Opened 10/15/2026

Brazos Valley·Texas

65% match

Well 6 Capacity Enhancement

Closes 11/12/2026Opened 10/21/2026

Jea·Florida

64% match

1412066050 (RFP) Brandy Branch Generating Station Ammonia Injection Lance Upgrade and Ammonia Sampling Grid

Closes 12/16/2026Opened 11/20/2025

Power Authority of New York·New York

64% match

Natural Gas Transportation- Astoria Energy II Power Plant

Closes 12/31/2026Opened 3/27/2024

Power Authority of New York·New York

64% match

Spot Natural Gas Supply

Closes 12/31/2026Opened 3/27/2024

Eden Prairie Schools·Minnesota

64% match

Transportation Building Fuel Tanks Replacement

Closes 11/24/2026Opened 10/29/2026

City of Doge City·Kansas

64% match

Red Demon Drive Improvements (due 11/03 @ 1:45pm)

Rolling / TBD closeOpened 9/25/2026

The City of Columbus·Ohio

64% match

RFQ033834 - GROVES AND KRIEGER CNG STATION RENOVATION

Closes 11/2/2026Opened 10/8/2026

Power Authority of New York·New York

64% match

Spot Natural Gas Supply - Richard M. Flynn Power Plant

Closes 12/31/2026Opened 3/27/2024

City of San Antonio·Texas

64% match

Vance Jackson (Loop 410 to Adrian Drive) (2022 Bond)

Closes 11/3/2026Opened 10/2/2026