Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›CIP 626 - COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROJECT…

City of Hermosa Beach·California

CIP 626 - COMMUNITY DEVELOPMENT BLOCK GRANT (CDBG) PROJECT 607325 Monterey Boulevard ADA Sidewalks & Access Ramps Cycle 2

Closes 2/12/2026$130k – $180kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Hermosa Beach is soliciting bids for the second cycle of its Community Development Block Grant (CDBG) sidewalk and ADA curb‑ramp replacement project on Monterey Boulevard. The contractor will demolish existing concrete sidewalks and curb ramps, install new 4‑in. Portland cement concrete sidewalks, construct ADA‑compliant curb ramps to Standard Plan 111‑5, install detectable‑warning tactile tiles, protect or replace trees, adjust utilities, and provide full traffic‑control and erosion‑control services. All work must be completed within a 25‑working‑day construction period, with each sidewalk segment reopened to traffic within 72 hours of removal. Federal Davis‑Bacon prevailing‑wage rules, CARB fleet‑compliance, and strict documentation (weekly certified payroll, solid‑waste reports, construction notices) are mandatory. • Scope includes demolition, concrete placement, ADA‑ramp construction, detectable‑warning surface installation, tree protection/removal, utility adjustments, and traffic‑control. • Contract value is based on an engineer’s estimate of $151,000; bonds, insurance, and a 10 % bid guarantee are required. • Tight schedule: 25 working days total, with a 72‑hour reopening requirement and $250/day liquidated‑damage penalty for overruns.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Magvern(Public Works Department)

[email protected]

(310) 318-0257

Key dates

Opened
1/22/2026
Questions due
2/4/2026
Pre-bid meeting
1/29/2026
Closes
2/12/2026
Duration
25 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
BID 26-001

Budget estimate

$130,000 – $180,000

The engineer’s cost estimate is $151,000, which typically represents the anticipated contract price for a public‑works concrete/sidewalk project of this size. Considering possible variations in bidder pricing, a realistic award range would be roughly $130,000 to $180,000. Factors influencing the final amount include the contractor’s unit‑price strategy, any change‑order scope adjustments, and the inclusion of mobilization/demobilization caps (≤ 5 %).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Cerritos·California

Top match · 80%

CDBG-Funded curb ramp/sidewalk repairs at Cerritos Towne Center Phase IV (CDBG Project No. 602800-26), Project No. 24302

Closes 11/18/2026Opened 10/23/2026

Illinois Commerce And Econ Opp·Illinois

78% match

Community Development Block Grant Community Revitalization Program

Rolling / TBD closeOpened 6/15/2026

City of Norwalk·California

78% match

CDBG CONCRETE ADA IMPROVEMENTS 2027 CITY PROJECT NO. 7946

Closes 11/10/2026Opened 10/16/2026

City of Pasadena·California

76% match

CDBG Sidewalk Improvement Project FY 2027

Closes 11/20/2026Opened 10/29/2026

City of Independence·Missouri

75% match

CDBG Minor Home Repair Program 2026-27

Closes 11/30/2026Opened 10/28/2026

City of Hermosa Beach·California

74% match

CIP 106 - Annual Street Improvements Project

Closes 12/9/2026Opened 10/29/2026

Illinois Commerce And Econ Opp·Illinois

74% match

Community Development Block Grant Disaster Response Program

Rolling / TBD closeOpened 4/5/2022

City of Morgan Hill·California

74% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026

Louisiana City of Baton Rouge and Parish of East Baton Rouge·Louisiana

74% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT

Closes 11/17/2026Opened 10/14/2026

San Bernardino County·California

74% match

North San Bernardino ADA Ramps

Closes 11/19/2026Opened 10/21/2026

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

74% match

CORA DRIVE SIDEWALK IMPROVEMENTS PROJECT CITY-PARISH PROJECT No. 24-EN-HC-0025

Closes 11/17/2026Opened 10/16/2026

City of Monterey·California

74% match

VETERANS PARK BIKE PATH, SEGMENT 4 PROJECT (NCP2435)

Closes 12/8/2026Opened 10/26/2026

City of San Bernardino·California

73% match

MAILBOX ONLY – FY 2027-2028 CDBG and ESG Notice of Funding Availability

Closes 12/7/2026Opened 10/22/2026

City of Vista·California

73% match

As-Needed Concrete Construction (CIP No. 8290)

Closes 11/25/2026Opened 10/22/2026

City of Morgan Hill·California

73% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/23/2026

California Department of Transportation·California

73% match

Mod Sig & Ltg, Pvmt repair, SW, curb ramp, segmental Conc Ret system.

Closes 11/5/2026Opened 10/5/2026

California Department of Transportation·California

73% match

Const SW,curb ramps,Pvmt,install & Mod Elect systems,drainage systems.

Closes 12/16/2026Opened 10/26/2026

City of Elk Grove·California

73% match

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

California Department of Transportation·California

73% match

Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting.

Closes 11/17/2026Opened 9/28/2026

City of Rancho Cordova·California

73% match

Rancho Cordova Complete Streets Implementation Guide

Closes 11/13/2026Opened 10/9/2026

City of Titusville·Florida

73% match

CDBG PUBLIC SERVICE FUNDING REQUEST FOR PROPOSAL

Closes 11/2/2026Opened 9/3/2026

City of Pasadena·California

73% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

City of Fresno·California

73% match

Chestnut Neighborhood Sidewalks

Closes 11/17/2026Opened 10/16/2026

LA Public Works Engineering Bureau·California

72% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

City of Alexandria·Louisiana

72% match

RFP #2606 – CDBG Minor Rehab

Closes 11/20/2026Opened 10/23/2026