Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arizona guideArizona Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Arizona
  4. ›Water and Wastewater
  5. ›Proposal for Residential Onsite Wastewater Treatment…

Navajo Nation·Arizona

Proposal for Residential Onsite Wastewater Treatment Services (OWTS) Installation for Tohatchi Chapter

Closes 3/16/2026$300k – $600kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This solicitation calls for the complete installation of residential on‑site wastewater treatment systems (OWTS) for the Tohatchi Chapter of the Navajo Nation. The contractor must assess each site, remove or crush abandoned septic systems, conduct soil testing, obtain all required permits, design and construct the new OWTS, and provide operation & maintenance manuals to homeowners. The work must be finished by 31 December 2026 and complies with Navajo Nation environmental, labor, and preference regulations. • Scope includes site evaluation, engineering design (PE‑stamped), permit acquisition, excavation, installation of tanks, risers, drainfields, and final inspection/reporting. • Mandatory deliverables: sealed cost proposal, technical proposal, numerous certifications (debarring, non‑collusion, IRS W‑9, subcontractor responsibility), and insurance/bond documentation. • Evaluation weighted on experience (20 %), methodology (10 %), cost (30 %), licensing/insurance/safety (20 %). • Bid guarantee of 10 % required for contracts > $50,000; performance bond up to 100 % of contract amount.

Attached files

Contact

Lyle C. Begay(Project Manager)

[email protected]

(928) 309-5539

Key dates

Opened
4/20/2026
Questions due
3/13/2026
Closes
3/16/2026
Projected award
3/18/2026
Duration
9 months

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
Bid No. 26-01-3998DB

Budget estimate

$300,000 – $600,000

Based on typical residential OWTS installations ranging from $15,000 to $30,000 per home, and assuming the contract covers roughly 20–40 homes across the chapter, the total contract value could fall between $300,000 and $1,200,000. Considering the bid guarantee requirement (10 % of total price) and the performance bond, a realistic earnings window for the contractor would be approximately $300k‑$600k after accounting for materials, labor, and overhead.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

The City of Columbus·Ohio

Top match · 73%

RFQ033860 - Olentangy River Rd/Snouffer Rd Home Sewage Treatment System

Closes 11/13/2026Opened 10/13/2026

North Carolina Orange Water and Sewer Authority·North Carolina

73% match

Jones Ferry Road WTP Rapid Mix Improvements

Closes 12/3/2026Opened 10/26/2026

Saline County Waterworks and Sanitary Sewer Public Facilities Board·Arkansas

73% match

Saline County Waterworks & Sanitary Sewer Public Facilities Board – WWTP Improvements

Closes 11/12/2026Opened 10/18/2026

Connecticut Town of Stafford·Connecticut

72% match

RFQ: On-Call Engineering Services for Wastewater-Related Needs

Closes 11/17/2026Opened 10/28/2026

Connecticut Town of Old Saybrook·Connecticut

72% match

Water Pollution Control Authority Environmental Studies

Closes 11/23/2026Opened 10/26/2026

TOWNSHIP OF PARSIPPANY-TROY HILLS·New Jersey

72% match

Full Document: Request for Proposals. Sewer Utility Superintendent & Engineering Consultant 2026-2027

Closes 11/13/2026Opened 10/29/2026

North Carolina Orange Water and Sewer Authority·North Carolina

72% match

Jones Ferry Road WTP Rapid Mix Improvements

Closes 12/3/2026Opened 10/27/2026

Dickenson County·Virginia

72% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

City of Palm Springs·California

71% match

PALM SPRINGS WASTEWATER TREATMENT PLANT ODOR CONTROL IMPROVEMENTS

Closes 11/10/2026Opened 10/13/2026

Navajo Tribal Utility Authority·Arizona

71% match

TUBA CITY WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT

Closes 11/24/2026Opened 10/21/2026

North Carolina Orange Water & Sewer Authority·North Carolina

71% match

Construction

Closes 11/10/2026Opened 10/19/2026

Town of Orange·Virginia

71% match

Town of Orange Water Treatment Plant Chemical Feed Building - PPEA

Closes 12/23/2026Opened 9/25/2026

Navajo Nation·Arizona

71% match

Proposal for the Tohatchi Diversion Project

Closes 11/20/2026Opened 9/16/2026

County of Hawaii·Hawaii

71% match

Kealakehe Wastewater Treatment Plant R-1 Upgrades

Closes 11/2/2026Opened 10/2/2026

City of Columbus·Ohio

71% match

Olentangy River Rd/Snouffer Rd Home Sewage Treatment System

Closes 11/13/2026Opened 10/13/2026

TOWNSHIP OF PARSIPPANY-TROY HILLS·New Jersey

71% match

Request for Proposals: Sewer Utility Superintendent & Engineering Consultant 2026-202. For the full document, click on the header below

Closes 11/13/2026Opened 10/29/2026

New York City Department of Environmental Protection·New York

71% match

82627B0004-BEDC OB-144A: Total Residual Chlorine (TRC) Optimization at the Oakwood Beach Wastewater Resource Recovery Facility (WRRF)

Closes 11/18/2026Opened 10/7/2026

City of Lake City·Minnesota

71% match

Lake City, City of – WWTF UV Disinfection Replacement

Closes 11/5/2026Opened 10/16/2026

Navajo Tribal Utility Authority·Arizona

71% match

TUBA CITY WASTEWATER TREATMENT PLANT IMPROVEMENTS PROJECT

Closes 11/24/2026Opened 10/20/2026

Department of Buildings & General Services·Vermont

71% match

Mt. Ascutney State Park - South Wastewater System Improvements

Closes 11/13/2026Opened 10/21/2026