Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›McCOMBS 30-INCH WELL COLLECTOR LINE REPLACEMENT

El Paso Water·Texas

McCOMBS 30-INCH WELL COLLECTOR LINE REPLACEMENT

Closes 9/2/2026$28.7M – $32.7MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of El Paso’s water utility (EP Water) is seeking qualified contractors to replace the 30‑inch well collector line for the McCombs water system. This is a competitive sealed‑proposal solicitation with an engineering cost estimate ranging from roughly $28.7 M to $32.7 M. Bidders must attend (or view) a virtual pre‑proposal meeting on 19 August 2026, submit questions by 24 August 2026, and deliver sealed bids by 2 September 2026. The bid opening will be broadcast live on 2 September 2026. The contract will be awarded in September 2026 (date TBD). • Scope: removal of existing 30‑inch collector line, installation of new 30‑inch line, associated civil works, testing, and commissioning. • Estimated value: $28.7 M – $32.7 M (engineer’s cost estimate). • Delivery: Single‑phase construction; schedule not disclosed. • Required: Bid bond prior to opening, compliance with EP Water’s specifications and drawings (available to registered suppliers). • Submission: Paper or electronic sealed bid to EP Water Purchasing & Contracts, 1154 Hawkins Blvd., El Paso, TX 79925. • Evaluation: Standard EP Water evaluation criteria; award expected September 2026.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

Key dates

Opened
8/9/2026
Questions due
8/24/2026
Pre-bid meeting
8/19/2026
Closes
9/2/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237110
Solicitation №
CSP28-26 Addendum 1

Budget estimate

$28,696,510 – $32,682,136

The engineer’s cost estimate is $28,696,510 – $32,682,137. Assuming the contract price will be close to this range (typical for public‑utility construction projects), the contractor’s revenue is likely within the same band. Adjustments may occur due to change orders, contingencies, or differing profit margins, but a reasonable expected budget range is roughly $28 M to $33 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Bossier Parish Police Jury·Louisiana

Top match · 67%

Goodwill Road at Highway 80 – Well #29 (Well #23 Replacement) – Consolidated Waterworks/Sewerage District No. 1

Closes 11/5/2026Opened 10/7/2026

Gloucester County·Virginia

66% match

IFB 27-012-CJ Clements Avenue Water Line Replacement

Closes 11/16/2026Opened 10/9/2026

Alabama Bill Nichols State Veterans Home·Alabama

65% match

Nichols Hot Water Line Repair

Closes 11/5/2026Opened 10/28/2026

City of Rockford·Illinois

65% match

LEAD SERVICE LINE REPLACEMENT PHASE 11I

Closes 11/2/2026Opened 9/14/2026

Washington Suburban Sanitary Commission·Maryland

65% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/19/2026

Massachusetts City of Medford·Massachusetts

64% match

IFB 27-0087 100 Lead Service Line Replacements

Closes 11/12/2026Opened 10/28/2026

Delaware County Regional Sewer District·Ohio

64% match

Tartan Fields Manhole Replacement

Closes 11/13/2026Opened 10/13/2026

LA Water & Power·California

64% match

8003R1 North Hollywood Central Remediation Well Collector Line

Closes 11/18/2026Opened 10/1/2026

City of Beaumont·California

64% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Nevada Department of Human Services·Nevada

64% match

Water Well Repair

Closes 11/3/2026Opened 10/20/2026

Bristol Virginia Utilities Authority·Virginia

64% match

CAST IRON WATER LINE REPLACEMENT PROJECT - PHASE 1

Closes 11/5/2026Opened 10/1/2026

Oregon Parks and Recreation Department·Oregon

63% match

ITB #14709 Silver Falls State Park Water Supply Well Replacement

Closes 11/2/2026Opened 9/21/2026

Utility Board of the City of Key West·Florida

63% match

Specifications for Line 9 Marker Ball and Static Line Repair

Closes 11/2/2026Opened 10/1/2026

County of Hernando·Florida

63% match

Replacement of Water Service Lines (Age and/or Emergency)

Closes 11/9/2026Opened 10/7/2026

Washington Suburban Sanitary Commission, MD·Maryland

63% match

Penn Manor Large Valve Vault Replacement

Closes 11/16/2026Opened 10/15/2026

City of Grand Forks, North Dakota·North Dakota

63% match

2027 Lead Service Line Replacement

Closes 11/19/2026Opened 10/29/2026

Town of Andrews·South Carolina

63% match

Cherry Street Sewer Upgrade

Closes 11/13/2026Opened 10/14/2026

City of Rockford·Illinois

63% match

LEAD SERVICE LINE REPLACEMENT PHASE 11H

Closes 11/2/2026Opened 9/14/2026

U.S. Department Of The Interior·California

63% match

Y--LB Lateral Water Line and Facilities Replacement for Wastewater System

Closes 11/11/2026Opened 10/27/2026

West County Wastewater·California

63% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

63% match

Cleaning Out and Plugging Twenty‑Five (25) Orphan Gas Wells – OOGM 26‑2

Closes 12/3/2026Opened 10/16/2026

City of Rockford·Illinois

63% match

LEAD SERVICE LINE REPLACEMENT PHASE 11G

Closes 11/2/2026Opened 9/14/2026

U.S. Department Of Agriculture·North Carolina

63% match

Oconaluftee Waterline Replacement

Closes 11/13/2026Opened 10/6/2026

Washington Transportation, Dept of·Washington

63% match

Five Troxler Nuclear Density Gauges, Model 3430+ 12 2 Standard W/Acc

Closes 11/9/2026Opened 10/9/2026

City of Anderson, SC·South Carolina

63% match

Fulwer Street Waterline Replacement

Closes 11/19/2026Opened 10/16/2026