This solicitation calls for the full replacement of an existing water well (Well #23) and the construction of a new production well (Well #29) along Goodwill Road at Highway 80. The contractor must perform all drilling, casing, screening, pump installation, electrical work, site grading, erosion control, and associated water‑line connections, as well as plug and abandon the old well and conduct a CCTV inspection before abandonment. The work is to be completed within a tight schedule, with a 60‑day contract period from the notice to proceed.
• Plug and abandon existing Well #23 (8‑inch PVC casing, pump setting removal) and perform a CCTV inspection.
• Drill, case, screen, and develop new Well #29 (including pilot hole, test well, deep well, 9‑inch steel casing, stainless‑steel screen, 4‑inch pump setting, sub‑mersible pump, motor, wellhead, and discharge assembly).
• Provide all site work: clearing, grading, erosion control, concrete pads, yard piping, and electrical connections to the raw water line.
• Submit required documentation: unit‑price sheets, engineering logs, test results, bid bond (≥ 5 % of bid), performance/bond guarantees, and certifications.