The project involves removing and replacing 6-inch full depth asphalt at the entrance of Rivers Crossing Subdivision in Bastrop County, Texas. The contractor will be responsible for removing the top 6 inches of unstable material and replacing it with compacted black base, and then capping the roadway with 1.5 inches of TY-D asphalt riding surface. The project also requires traffic control, which must comply with the Texas Manual on Uniform Traffic Control Devices and TxDOT's Barricade and Construction standard sheets.
• The estimated quantity of materials needed for the project includes 2178 square yards of flexible pavement structure repair and 180 tons of D-GR HMA TY-D PG70-22.
• The contractor must mobilize and start work within 30 days of receipt of a Notice-To-Proceed issued by Bastrop County.
• Payment and performance bonds will be required for the contract, with the cost of the bonds included in the bid price.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.