This solicitation calls for the design‑build style construction of two new lighted basketball courts at Lenora Park in Snellville, GA, including site grading, concrete work, retaining walls, chain‑link fencing, LED lighting, utility installations (electrical service and water line), landscaping, and required erosion‑control measures. The contractor must self‑perform at least 20 % of the work, provide a 5 % bid bond, and be capable of furnishing 100 % performance and payment bonds meeting GA surety requirements. The project’s construction window is a 120‑day period from early November 2026 to early March 2027, with liquidated damages for overruns.
• Build two lighted, 2‑court basketball facilities (court surfacing, lighting, ball‑return systems).
• Provide related civil works: retaining wall, chain‑link fencing, drainage, water line, and site grading.
• Perform electrical work for LED lighting, conduit, panels, and utility connections.
• Execute landscaping, irrigation tie‑ins, and erosion/sediment control per GSWCC guidelines.
• Meet bonding, insurance, and staffing (full‑time superintendent) requirements and submit sealed bids by August 27 2026.